As a result of the soil work carried out by our specialists, the condition of the plantation has significantly improved and optimal conditions have been created for its full development.
Description
The goal of the project was to improve the plantation and soil structure so that a 5–6-year-old plantation with slowed growth could develop fully. The work we carried out significantly improved water drainage and air circulation in the root system, stimulated root growth, enhanced nutrient uptake from the soil, and noticeably improved the plants’ physiological condition.